Timeline
Timeline
[ WEAVE acronyms ]
Autumn 2024 | Scientific results published from first-light observations |
17 Jun 2024 | Start of standdown for investigation of spectrograph misalignment |
31 Oct 2023 | Inauguration of WEAVE and start of regular LIFU science observations |
Apr 2023 | LIFU commissioning completed |
12 Dec 2022 | |
Nov 2022 | Science observations start |
Aug 2022 | |
25 May 2022 | |
Jul 2021 | |
Mar 2021 | Red detector arrives at the WHT |
Dec 2020 | Blue detector arrives at the WHT |
Dec 2020 | Positioner arrives at the WHT |
Sep 2020 | |
Aug 2020 | Spectrograph arrives at the WHT |
Jun 2020 | Prime Focus Corrector arrives at the WHT |
Feb 2020 | LIFU completed |
Feb 2020 | MOS fibres installation on Plate A |
Mar 2019 | Rotator arrives at the WHT |
29-30 Jan 2019 | WEAVE SPA meeting 8, Groningen |
20-21 Sep 2018 | WEAVE Galactic Archaeology team meeting, Naples |
17-20 Sep 2018 | WEAVE All-Hands Meeting 2018: Naples |
2-3 Jul 2018 | WEAVE SPA meeting 7, Cagliari |
Jun 2018 | Operational Rehearsal 3 |
22 Jun 2018 | |
30-31 Jan 2018 | WEAVE SPA meeting 6, IAC, Tenerife |
11 Jan 2018 | WEAVE WRS FDR, Bilbao |
30 Nov 2017 | WEAVE WCS FDR, Barcelona |
27-1 Dec 2017 | Week of WEAVE 2017: Galactic Archaeology team meeting, Barcelona |
13-27 Nov 2017 | WEAVE Engineering Stand-down 4 |
1st-3 Nov 2017 | WEAVE All-Hands Meeting 2017: Groningen |
26-28 Sep 2017 | WEAVE AIT meeting, Schiphol |
13-14 Sep 2017 | WEAVE PRI system AIT workshop at RAL |
12-13 Jul 2017 | WEAVE-QSQ team meeting, Marseille |
29-30 Jun 2017 | WEAVE SPA team meeting 5, Cambridge |
13-14 Jun 2017 | WEAVE SCIP team meeting, Alicante |
12-19 Jun 2017 | WEAVE Engineering Stand-down 3 |
5 May 2017 | Fibre Positioner dFDR |
8 Mar 2017 | Observatory Control System Final Design Review |
19-21 Nov 2016 | WEAVE All-Hands Meeting 2016, Cambridge |
13 Dec 2016 | IAC publishes tender to deliver the instrument rotator |
28Nov 2016 | Week of WEAVE meeting at the Lorentz Center, Leiden |
10Nov 2016 | SPA meeting 4 |
9Nov 2016 | FDR for the WEAVE Archive System (WAS) at Groningen |
4 Oct 2016 | WEAVE Operational Rehearsal 1 held at Groningen |
Aug 2016 | IAC tender to deliver an assembled PFC is published |
19-20 Jul 2016 | The WHT flip ring was removed from the WHT and successfully reinstalled. This was carried out as a demonstration in preparation for the arrival of WEAVE. This was the first time in the history of the telescope that this ring had been separated from its support structure. Read more about this here. |
Mar 2016 | Final funding announcement for IAC (FEDER, 1.8M€) |
Mar 2016 | Fibre Retractors Complete |
Mar 2016 | PRI lens 4 ready for coating |
Mar 2016 | FTS delivered to IAC |
Feb 2016 | Positioner contract placed with Schunk |
Jan 2016 | PRI Trolleys delivered to WHT |
20-21 Jan 2016 | Jan Galactic Archaeology Science Team Meeting |
Nov 2015 | PFC Blank 2 delivered to Kiwistar |
20-21 Oct 2015 | Fibre System FDR |
19-20 Oct 2015 | Science and Survey Strategy Review |
23rd-24 Sep 2015 | PRI Focus Translation System FDR |
Sep 2015 | PFC Blank 5 delivered to Kiwistar |
28 Aug 2015 | PRI Trolleys FDR |
8 Jun 2015 | MultiLateral Agreement is now fully signed by all agencies |
3 Jun 2015 | Franche Comté provides funds for WEAVE fibres |
27-29 May 2015 | WEAVE Science Planning meeting at Leiden |
15 May 2015 | Engineering grade CCD231-C6 delivered by e2V |
23 Apr 2015 | PDR for Archive System |
23 Apr 2015 | FDR Core and Advanced Processing System |
18 Mar 2015 | FDR for Spectrograph System |
Mar 2015 | Conference: "Multi-Object Spectroscopy in the Next Decade: Big Questions, Large Surveys and Wide Fields" |
22nd Jan 2015 | FDR for Fibre Positioner System |
Nov 2015 | PFC Blank 2 delivered to Kiwistar |
19 Dec 2014 | PFC Blank 1 delivered to Kiwistar |
2nd Dec 2014 | PFC Blank 3 delivered to Kiwistar |
3 Nov 2014 | PFC Blank 4 delivered to Kiwistar |
22nd Jul 2014 | France's Conseil Scientifique Régional d'Île-de-France approves funds for WEAVE |
28 Jun 2014 | WEAVE well-represented at SPIE in Montreal |
26 Jun 2014 | Spain's Plan Nacional approves funds for WEAVE |
13 Jun 2014 | Kiwistar selected to polish PFC lenses |
10 Jun 2014 | PDR of the CPS/APS |
30 Apr 2014 | Blank for PFC lens 1 ordered |
29 Apr 2014 | Spain's FEDER committee approves funds for WEAVE |
11 Apr 2014 | Published tender for PFC lens polishing and coating |
30 Mar 2014 | Science CCDs ordered from e2v |
25 Mar 2014 | Full UK funding released by STFC |
25 Mar 2014 | WEAVE Board meeting in Rome. Attended by INAF Directors following the agreement to include Italy in the project. |
20 Feb 2014 | First MOS fibre prototype received |
12 Feb 2014 | Final design stage mid-term assessment |
31 Jan 2014 | Positioner PLC received |
30 Jan 2014 | Spectrograph optical final design review |
24 Jan 2014 | Prime focus corrector blank (B6) has been completed |
19 Dec 2013 | Successful Gaia launch |
15 Nov 2013 | Five of the six prime-focus corrector blanks are ordered |
7 Nov 2013 | STFC's Science Board recommends full funding for WEAVE |
6 Sep 2013 | STFC PPRP visiting panel at RAL Space |
9 Jul 2013 | Final prime-focus optical design FDR |
3rd-4 Jul 2013 | STFC PPRP meeting |
30 Apr 2013 | STFC PPRP funding proposal submitted |
22-23 May 2013 | WEAVE Engineering meeting to close preliminary design stage (Stage Two) and initiate final design stage (Stage three) |
19-20 Mar 2013 | Preliminary design completion |
21 Feb 2013 | NWO (Dutch Science Foundation) awards 960 k€ for WEAVE hardware to Prof.dr. S.C. Trager (WEAVE NL PI, Project Scientist, and Deputy PI) through its NWO-M programme. See this page for a short description of the project (in Dutch) |
18 Feb 2013 | Preliminary Design Review (PDR) documentation delivered to reviewers. PDR will be held in Madrid 19-20 Mar 2013 |
Oct 2012 | Workshop: "La Palma and Calar Alto Observatories, Science in the Next Decade" |
11 Oct 2012 | NWO (Dutch Science Foundation) Board of Exact Sciences approves 2M€ for staff costs connected to WEAVE design and construction in the period 2012-2015 |
26-27 Jun 2012 | WEAVE project stage II Mid-Term Assessment meeting in Liverpool. Project progressing as desired |
17-18 Apr 2012 | WEAVE Engineering meeting in Amsterdam. Conceptual designs discussed and moved towards preliminary designs |
13 Feb 2012 | ING science strategy 2013-2022 released |
2nd Jan 2012 | Start of WEAVE project stage II, in which preliminary designs are developed |
2012 | Funds received from Île-de-France for prototyping MOS fibres |
19 Dec 2011 | End of WEAVE project stage I. Final science cases delivered |
3 Oct 2011 | Start of WEAVE project stage I, in which the user requirements will be captured. Final science cases and a concept-of-operations document will be delivered by 16 Dec |
22-23 Sep 2011 | WEAVE kick-off meeting in Amsterdam. Engineering session on Thursday 22nd Sep. Science session on Friday 23rd Sep |
13 Jul 2011 | STFC's PPAN (Particle Physics, Astronomy and Nuclear Physics) science committee states that WEAVE is one of the highest priorities for UK investment in new grou-based astronomical instrumentation, and recommends that STFC provides support through the design phase |
14 Apr 2011 | Presentation about WEAVE made to STFC's PPAN (Particle Physics, Astronomy and Nuclear Physics) science committee by Gavin Dalton (RAL) |
31 Jan 2011 | 'Statement of interest' submitted to STFC. The partners are STFC, the University of Oxford, LJMU, Rijksuniversiteit Groningen, ASTRON, Observatoire de Paris, Lund University and ING |
11 Jan 2011 | Piercarlo Bonifacio and team join the WEAVE consortium following the closure of the GYES project |
30 Nov 2010 | Conceptual designs of the new prime-focus corrector for the WHT, and of the spectrograph components, were presented at the WEAVE engineering meeting, Heathrow |
14 Oct 2010 | Proposed WHT MOS instrument named as WEAVE (WHT Enhanced Area Velocity Explorer) |
1 Oct 2010 | Letter of intent submitted to ESO for the construction of a MOS on the WHT |
26 Apr 2010 | "WHT MOS Science Group meeting", London |
Mar 2010 | Workshop: "Science with the William Herschel Telescope 2010-2020" |
Sep 2008 | Report by the European Telescope Strategic Review Committee of ASTRONET on "Europe's 2-4m Telescopes Over the Decade to 2020" |